Air filter tender - Shanxi Yongji "big pressure on the small" cogeneration project
Air filter of choice for the ten brand spirit clean air filter manufacturers, is the largest area of Southern China, advisory Li Gong 15914315027
Content:
Tendering Agent: China Energy Equipment Co. Ltd. the tenderee: CPI Shanxi Yongji Thermal Power Co. Ltd. Shanxi Yongji "big pressure on the small" cogeneration project
Chinese Energy Equipment Co Ltd entrusted by the tenderee, the public bidding of Shanxi Yongji "big pressure on the small" cogeneration project fourth batch of auxiliary equipment, the post qualification tender.
The basic situation, the project
The tenderee: Shanxi Zhangze electric power Limited by Share Ltd
Design unit: Shanxi Provincial Electric Power Survey and Design Institute
Tendering Agent: China Power Equipment Co., Ltd.
Project location: Yongji City, Shanxi Province
Fund sources: the project by the Shanxi Zhangze electric power Limited by Share Ltd to invest in the construction, raised 20% capital, the rest is a bank loan.
The overall progress of the project: plans to start in 2013 October for #1 unit, #2 unit extended 2 months; #1 unit plan time for operation 2015 February, unit #2 extended for 2 months
Two, the tender list section cases
The main technical parameters for bid number number number name of bidding documents
Expenditure (yuan)
1 coal bunker dredging device HD-CT-06-2013-081 40 coal bunker dredging device 40 sets (a total of 10 coal scuttle, mainly including: dredging machine pull rod assembly, 10 sets of hydraulic station, an electric control box) 1000
2 auto sampling device HD-CT-06-2013-082 22 Bridge Auto sampling device 1000
The 3 truck scale HD-CT-06-2013-083 32 (heavy vehicles) 120t, 1 (empty) 50t 1000
4 air compressor, air storage tank HD-CT-06-2013-084 168 60m3/min screw air compressor air storage tank 1000, 8
5 compressed air purification system of HD-CT-06-2013-085 8 technology using compressed air system design of a total of 5 Taiwan (sets) refrigeration dryer (including centrifugal oil-water separator, ago, filters); the control air system design by 3 (sets) no heat regenerative adsorption dryer (including centrifugal oil-water separator, before 1000, the post filter)
Air cooled screw chiller 6 HD-CT-06-2013-086 6 single refrigerating capacity of 310KW 1000
7 temperature and pressure reducing device HD-CT-06-2013-087 2 steam flow rate: 8 t/h 1000
8 water filter (with filter) HD-CT-06-2013-088 4 industrial cooling water filter 4 units (each unit with 2 units: the vertical layout), used for the purification of ancillary equipment cooling water inlet 1000
9 steam turbine quick cooling device of HD-CT-06-2013-089 1 from the air filter entrance to the header outlet check valve, including: air oil filter, air heater, flow measurement system, temperature measurement and control system, electric control system and control box, pressure measurement system, the header, the scope of supply system is connected with the pipe and valve 1000
The 10 part of all kinds of chemical tank HD-CT-06-2013-090 91 sets of filter backwashing water tank, 2 sets of ultrafiltration water tank, washing tank 1 Taiwan, 1 Taiwan air cooling spraying water tank, 2 floating demineralized water tank, 2 monolayer film type flexible floating roof 1000
System for processing water lime 11 city (EPC) HD-CT-06-2013-091 1 this project adopts advanced treatment of reclaimed water project contractor (EPC). This project is a full set of equipment, materials by the bidder is responsible for providing; and take the advanced water treatment station design process within the region develop, station (Geological Exploration except), civil engineering, installation, commissioning, trial operation division and overall performance test; through the test run and performance test, signed a provisional approval visa (tender we ran into a business) general contracting process. 1000
The main plant and Auxiliary Workshop 12 factory closed circuit TV monitoring system HD-CT-06-2013-092 1 plant closed circuit TV monitoring system to monitor the surface coverage, two sets of units, construction temporary closed-circuit television monitoring system configuration complete hardware, software, man-machine interface. Configuration design in accordance with the "analog + digital" program, the main control equipment for digital video host, the client host monitor equipment (not the host matrix), can realize the transmission of digital image signal, hard disk video recording, and connected with the MIS system in the whole plant. 1000
13 6kV HD-CT-06-2013-093 medium voltage variable frequency device 62 sets of high pressure condensate pump pump, 4 sets of primary air fan VVVF device 1000
14 air cooled low-voltage inverter system HD-CT-06-2013-094 72 the project of 2 sets of air cooling units, each configuration air cooling unit 36 Typhoon aircraft (of which 24 is downstream wind machine, 12 sets of reversible fan). Each fan configuration of a frequency converter. 1000
15 6kV medium voltage switchgear HD-CT-06-2013-095 1 quantity in the bidding document 1000
The 16 main plant DC system equipment HD-CT-06-2013-096 1 quantity in the bidding document 1000
Special instructions:
More than 1 of the reference parameters and specific parameters, number, number to the tender documents shall prevail.
2 the bidder in the tender documents, to prove that a copy of the contract documents to meet the performance requirements of the submitted at the same time (including the cover page, the main parameters, such as the signature page). And provide the user units, production / production date and contact way, to prove that it satisfies the bidding qualification requirements. Otherwise, the tenderer shall have the right to the bidding documents deemed invalid.
Three, the bidder qualification requirements
(a) the basic qualification requirements
1 the bidder should have the qualification of independent legal contract;
2 has perfect quality management system, must be issued by the ISO9001 certification qualification agencies certified by the state or equivalent certificate of quality management system;
3 have the ability to perform the contract, including professional, technical and
4 the bidder shall have the project bidding performance similar, and must meet specific eligibility requirements table performance requirements;
5 in the last three years did not win the bid, serious breach of contract and other bad behavior;
6 not in being ordered to suspend business, property receivership, freezing and bankruptcy;
7 operating in good condition, two consecutive years or more profit.
(two) the special qualification requirements
Serial section name special qualification
1 coal bunker dredging device bidders in China in recent five years with the similar equipment at least 3 grade 300MW and above thermal power projects, and successfully run for more than 2 years of performance.
2 auto sampling device shall be in China in recent 5 years has at least 3 grade 300MW and above thermal power projects of similar equipment and run successfully for more than 2 years of performance.
The 3 truck bidders should be in China in recent 5 years has at least 3 grade 300MW and above thermal power projects of similar equipment and run successfully for more than 2 years of performance.
4 air compressor, air storage tank at home and abroad in recent five years the bidder has at least 3 similar equipment 300MW grade and above thermal power projects, and successfully run for more than 2 years of performance.
5 compressed air purification system in China in recent five years the bidder has at least 3 similar equipment 300MW grade and above thermal power projects, and successfully run for more than 2 years of performance.
The 6 air cooled screw chiller in China in recent five years has at least 3 similar equipment 300MW grade and above thermal power projects, and successfully run for more than 2 years of performance.
7 temperature and pressure reducing device bidders in China in recent five years with the similar equipment at least 3 grade 300MW and above thermal power projects, and successfully run for more than 2 years of performance.
8 water filter (with filter) bidders in China in recent five years has at least 3 similar equipment 300MW grade and above thermal power projects, and successfully run for more than 2 years of performance.
A fast cooling device for the China in recent five years has at least a similar device 3 300MW grade and above thermal power project 9 turbine, and successfully run for more than 2 years of performance.
The 10 part of the chemical tank at home and abroad in recent five years has at least 3 similar equipment 300MW grade and above thermal power projects, and successfully run for more than 2 years of performance.
System for processing water lime 11 city (EPC) bidders in China in recent five years has at least 3 similar equipment 300MW grade and above thermal power projects, and successfully run for more than 2 years of performance.
12 the closed-circuit television monitoring system at home and abroad in recent five years the bidder has at least 3 similar equipment 300MW grade and above thermal power projects, and successfully run for more than 2 years of performance.
13 6kV medium voltage variable frequency device bidders registered capital of not less than 5000000 yuan. High voltage inverter adopts imported brand, with the similar equipment 300MW grade and above thermal power project, a copy of the contract the operation performance of not less than 10 power plant in three years.
14 air cooled low-voltage inverter system bidders registered capital of not less than 5000000 yuan. Converter cabinet in the same equipment 300MW grade and above thermal power project, a copy of the contract the operation performance of not less than 10 power plant in three years.
15 6kV medium voltage switchgear bidders registered capital of not less than 50000000 yuan. In the similar equipment 300MW grade and above thermal power project, a copy of the contract the operation performance of not less than 5 power plant in three years.
The 16 main plant DC system equipment bidders registered capital of not less than 20000000 yuan. In the similar equipment 300MW grade and above thermal power project, a copy of the contract the operation performance of not less than 5 power plant in three years.
Four, sale of tender documents
(a) at the time and place
In February 21, 2014 -2014 year in February 27th (except legal holidays), 9:00-11:30 in the morning, afternoon 13:30-16:30 in China power equipment information network (www.cpeinet.com.cn) online sale to buy, do not accept the.
(two) the purchase
1 the web site registration
Never in China power equipment information network (www.cpeinet.com.cn) registered on the unit should first website registered, please upload the following data scanning when registering a:
(1) corporate business license copy (must be examined within the period of validity, affixed with the official seal, and examined with making positive page page in page).
(2) the registered contact ID (the two generation ID card making double-sided combined on one page).
2 Data Auditing
In the sale of time, login Chinese power equipment information network (www.cpeinet.com.cn) fill in the application form and scanning to purchase the tender document upload the following documents piece:
(1) power of attorney of the legal representative (according to site requirements issued by the format).
(2) the purchase of contact (licensee) identity card (the two generation ID card making double-sided combined on one page).
3 payment
(1) the online payment
Online payment in China power equipment information online (currently supports ICBC corporate banking and personal banking account registered account).
Recommend the use of such payment of tender document fees, can save time waiting for scanning and uploading telegraphic transfer receipt and payment information audit, so that timely download the tender documents.
(2) TT payment
The tender document will be the money into the designated bank account, fill in the remittance remittance information and upload the wire transfer receipt scanning in Chinese power equipment information online.
Remittance account information:
Account Name: Chinese Energy Equipment Co., Ltd. Beijing branch
Account number: 020002230900340323
Bank: Industrial Commercial Bank of China Ltd Beijing six shop Kang Branch
4 file download
To purchase the tender documents cost online payment, or wire transfer information through the audit, which opened the electronic version of the Bidding Documents Download function.
(three) the bidding documents purchase
Tel: 010-51965501
Fax: 010-51965800 5501
E-mail:info@cpcec.com
(four) the tender document answering
The bidding document all need to clarify the problem of scanning, scanning PDF version and the version of word Email to:
1 unit: Shanxi Yongji thermal power plant
Contact person: Xue Jianguo
Tel: 0359-8013021, 13934372678
E-mail: yjrdxjg@163.com
The bidding document to clarify all the required Email to China energy equipment limited company, contact us as follows:
The 2 unit name: Chinese Power Equipment Co., Ltd.
Contact person: Wang Lichun
Tel: 010-56995226
Fax: 010-56995250
E-mail: wanglichun@cpcec.com
(five) other matters
1 the bidding document after sale, fees are not refundable.
2 this notice in the China procurement and bidding (www.chinabidding.com.cn) and China power equipment information network (www.cpeinet.com.cn) published.
Five, closing / opening time, place
Tender / bid opening time: 09:00 a.m. March 11, 2014 (Beijing time, if there is a change of prior written notice)
Tender / bid opening place: Taiyuan Shanxi Hotel Internazionale; address: Shanxi Taiyuan Yingze Street No. 108; the hotel telephone: 0351-8827777 (subject to change prior written notice)
Two, one four February 21st
Air filter of choice for the ten brand spirit clean air filter manufacturers, is the largest area of Southern China, advisory Mr. Manson Lee 15914315027
Ling Jie Guangzhou air filter from will network
Related products: air filter air filter air filter 1000 Guangzhou high efficiency air filter air filter -Guangzhou Lingjie
GZLJ Star products: Air filter HEPA filter MEPA filter Primary efficiency filter Bag filter Carbon activated filter Air shower Air shower room Air shower channel FFU HEPA outlet Pass box Clean bench Fan filter box Clean shed<
Copyright: Guangzhou Lingjie Air Purification Equipment Manufacturing Co.,Ltd. 粤ICP备13059951号-2 Management Entry